INCENTIVE PACKAGE FOR INDUSTRIES

Authority has been pleased to extend the ‘Incentive Package for Industries' upto 30.06.2005.

All categories of industry except until further order, will be regulated, under the incentive packages, as per following provision:-

Sr. No

Details

a

The industrial connections lying disconnected for six months or more will pay 25% of total arrears as down payment whereupon connection will be restored subject to the provisional Reconnection Policy notified vide No. 1357-74/M(P) /GMCS/ DD(R&CP) /59026 dated 11.10.1999 and exemption given in Clause No. c below.

b

The balance arrears outstanding against that industrial unit are allowed to be paid in monthly installments. The Chief Executive Officers are permitted to decide number of installments which shall not exceed 12 No. of installments irrespective of No. of months to which arrears pertain.

c

Minimum/ fixed charges recoverable under Clause-ii of the Reconnection Policy circulated vide No. 1357-74/GMCS/DD(R&CP)/ 59026 dated 11.10.1999 are exempted for those consumers who will come forward for Reconnection and pay 25% of total arrears as down payment before 30.06.2005. Exemption will also be admissible to those consumers against whom there is no arrear.

d

Disconnected industrial consumers applying for reconnection within 5 years of disconnection date be given relief for the cost they had already paid less depreciation. Only differential cost would be charged for reconnection. Depreciation value will be calculated on the basis of 20 years useful life of equipment.

e

Industrial consumers, seeking reconnection within 5 years of disconnection date are allowed to pay 50% of additional security deposit as down payment before reconnection and balance 50% in 3-4 installments payable upto 30.06.2005, subject to the condition that sanctioned load remains unchanged. However this relief will not be applicable to the industries where electricity is used as indigenous raw material such as Arc Furnaces etc.

f

Mark up will be levied on payment of arrears in installments as per prevalent bank rate.

g

The defaulting consumer who are not interested in getting reconnection also also allowed to clear their outstanding arrears in installments in the manner prescribed at Sr. No. 2.

h

If any industrial unit defaults in payment of current monthly bill or installment amount, the connection of that unit will be disconnected without giving any notice required under normal practice and he will not entitled to re-avail above packages next time.

i

An undertaking subject to above conditions will be obtained before restoration of the connection.

j

10% rebate will be given on minimum of 25%increase in KWH consumption of a billing month gained on existing load and not through extension in load as compared to the average consumption for three months of the previous year. The average consumption will be calculated by taking the corresponding, preceding and succeeding months of last year. The rebate will be admissible only on the variable charges based on increased consumption and is not to be given on fixed charges, Hydel Surcharge, Electricity Duty, Income Tax and GST.

k

7% incentive per annum will also be given to those consumers who will make advance payment, in addition to normal consumption bill issued manually or through computer of their electricity bills equivalent to average bill for a period of three months, adjustable against future monthly bills.

l

Load sanctioning authority of an industrial connection will be the competent autority to allow above incentive package. However CEO of the company will be the final authority in all cases. In case of any dispute, before approaching any other forum, the mater shall be referred to the authority next to the load sanctioning authority of that connection. GM (Customer Services) will be final competent authority to resolve the disputes. The disputes will be decided within one month period.

2.

RELIEF PACKAGE FOR NEW CONNECTIONS TO B-1 CONSUMERS (LOAD UPTO 40 KW)

Authority has decided to provide a Relief Package for new Industrial B-1 connections (having load upto 40KW) for small Industrial Consumers including cottage Industries, who face tremendous difficulties/ financial hardship in getting new connections. The salient features of this package are as under:-

 

a) Relief in overhead chares of capital cost.

 

b) Reduce burden in payment mode of capital cost.

 

The SOP regarding granting industrial connections under Tariff B-1 (upto load 40 KW) is as under:-

i)

Out of the total 20% overhead charges, only 12% will be charged by the store formations on requisition of the material for B-1 connection and remaining 8% charges will not be charged by the field formation

ii)

The applicant will require to pay 50% of the total estimated capital cost and on payment thereof, processing of the connection case shall commence.

iii)

The remaining 50% of total estimated capital cost will be recovered in five (5) equal monthly installments through monthly electricity bill, after installation of the connection.

3.

RECOVERY OF ARREARS FROM PERMANENTLY DISCONNECTED CONSUMERS.

The authority decided that permanently disconnected consumers with age five year or above as on June 30, 2004, are allowed to pay fifty percent of the arrears and remaining fifty percent amount will be waived off. This incentive package for recovery of arrears for permanently disconnected consumers will remain effective upto 30.06 2005. After settlement of arrears, such consumers will be entitled to new connection as per existing policy. This relief, however, will not be applicable to defaulting consumers of Arc / induction steel Furnaces.

4.

IN ORDER TO FACILITATGE DOMESTIC CONSUMERS. AUTHORITY DECIDED AS UNDER:-

 

•  New domestic connection charges of Rs. 3000 (Rupees three Thousand only) for singe phase meter will be divided into two parts:-

•  Rs. 300 (Rupees three hundred only) to be recovered at the time of connection.

•  The remaining amount of Rs.2700/- (Rupees Two thousand Seven Hundred only) would be recovered in nine equal installments of Rs. 300/- (Rupees three hundred only) each in subsequent bills.

 

•  The facility will be provided to those consumers who opt and give written request for the said facility.

 